LEAD Action News Volume 22 Number 2 June 2024 36 of 73
Lead: Important Dates
We wanted to empower you with lead-awareness so
created this list of important dates so that you can keep
them handy for future reference.
Limiting Lead Content in Residential Paint
● In Australia, from 1997 lead was limited in residential
paint to 1000 ppm.
● From 2021 it was limited to 90 ppm.
● The LEAD Group recommends either assuming pre-
1997 paint should not be dry-sanded or heat-gunned
OR test it.
Phasing Out Leaded Petrol
● In Australia, leaded petrol was phased out in 2002.
● The LEAD Group recommends testing for lead in ceiling void dust in urban homes and other
buildings built before 2002.
Brass Taps
● In Australia, brass taps are still permitted to contain up to 4.0% lead.
● All drinking water from new brass taps installed in the last 3-4 years should be tested at a lab
for lead.
● The LEAD Group recommends that you only install stainless steel taps.
Leaded Flashing on Roofs
● Since 2004 the Australian Building Code has stopped lead flashing being placed on planned
rainwater collection roof areas.
● Rainwater should be tested for lead in any home built before 2004 or any later home where
the rainwater tank was added after the building was built.